Skip to main content
Oil & Gas, Marine

Tank Sweeping & Oil Unloading Rotary Lobe Pumps

Review rotary lobe pumps for oil unloading and pumpable tank-residue recovery, with attention to changing liquid levels, residue properties, interrupted supply, reverse-flow requirements, and installation space.

Request Pump Sizing

Separate Bulk Unloading from Residue Recovery

Bulk unloading and final tank stripping can impose different inlet conditions and flow requirements. This page covers transfer of pumpable oil and residues; removal or preparation of solid deposits and the wider tank-cleaning process need separate assessment.

Transfer stages
Bulk flow and final stripping. Provide the required flow, source and destination levels, transfer time, and expected changes as the tank empties.
Residual material
Oil, water, wax, and sediment. Describe viscosity at temperature, settled grit, hard debris, and any cleaning liquid mixed into the residue. Confirm that the material can reach the pump inlet.

Changing Suction Conditions & Seal Support

As the liquid level falls, gas or vapor may enter the suction and interrupt liquid supply. Review pump elevation, minimum source level, hose or pipe layout, and measured inlet pressure where available. Tank depth alone does not establish the operating suction lift.

Confirm priming conditions, seal arrangement and support, and shutdown criteria for the selected configuration. Any allowable empty-pipe or gas-liquid exposure depends on the actual fluid, speed, duration, and controls rather than a general self-priming height or unrestricted dry-running claim.

Unloading and Stripping Review
Review Point Why It Matters Data Needed
Fluid and startup Residues may differ from the bulk oil Viscosity-temperature data, wax, sediment, cleaning fluids, shutdown duration
Inlet supply Falling levels and gas exposure change suction conditions Level range, pump elevation, suction size and length, gas or vapor observations
Transfer pressure The drive and pressure protection must suit the full route Flow range, discharge pressure, pipe or hose dimensions, elevation, valve layout

Loading, Unloading & Reverse-Flow Review

If the same pump is intended for loading and unloading, define the required flow, pressure, fluid, and inlet conditions in each direction. Confirm that the proposed pump and seal arrangement are suitable for both operating points.

Review valves, non-return devices, pressure relief, and control sequences for reversal. Reversing the motor alone does not establish a complete bidirectional system, and equal flow or pressure capability in both directions should not be assumed.

Skid or Trailer Layout & Site Requirements

Provide the installation envelope, mounting arrangement, connection locations, available drive, and space for lifting and maintenance. Compare proposed pump and reducer layouts using dimensioned drawings; confirm actual dimensions and service access if a built-in reduction arrangement is considered.

Review wetted materials against the oil, residue, and cleaning chemistry. Include H2S exposure where present and the site’s area-classification, electrical, and documentation requirements. Required certificates and equipment scope must be confirmed against the actual offer.

Data for Tank Sweeping & Unloading Pump Sizing

  • Material: bulk oil and residual composition, viscosity-temperature data, wax, solids and grit, gas exposure, H2S where present, and cleaning fluids.
  • Duty: flow and pressure with units for each stage or direction, transfer volume and time, startup conditions, and expected interruptions to liquid supply.
  • Installation: tank level range, pump elevation, hose or pipe layout, skid or trailer envelope, available drive and controls, maintenance space, and site requirements.

Request Tank Cleaning & Unloading Pump Sizing

Share your oil and residue characteristics, unloading stages, and installation layout through our contact form for an application review.

Request Pump Sizing
WhatsApp +86 150 6779 6088